thanks guys. Getting ready to order the drop ceiling supplies. Need to rent a 360 degree laser level to lay out the lines for it. Still plenty of panel and finish work to do on the I-beam, jack post, and east short wall adjacent to the staircase. Itching to get the TV. Black Friday (are we still permitted to say that comrades?) is soon upon us.